Find activities

  • Lady Anne Level Crossing

    We are conducting a feasibility study to examine the option to close Lady Anne level crossing and Batley signal box by the end of 2022, subject to funding. This study is being carried to enable major railway improvements between Dewsbury and Leeds as part of the Transpennine Upgrade – such... More
    Opened 29 May 2020
  • Unblocking the Croydon Bottleneck Phase 2

    The public consultation which ran from 1 June to 20 September 2020 is now closed. Please visit www.carsconsultation.com to find out more about the Scheme. We are now in the process of reviewing your responses. Your feedback will help us... More
    Opened 1 June 2020
  • Ely Area Capacity Enhancement Scheme

    Please visit www.elyareacapacity.com for full details on this scheme consultation. More
    Opened 21 September 2020
  • Shaws and Crabtree Level Crossing

    Shaws and Crabtree level crossings are on the Wigan to Southport line. They are used by drivers, pedestrians, cyclists and horse riders in very low numbers. Miniature stop lights indicate to drivers if it is safe to cross and they are then required to operate the crossing themselves and cross... More
    Opened 15 February 2021
  • C3R Consultation

    Please visit c3rconsultation.com for full details on this scheme consultation. More
    Opened 1 March 2021
  • Ely Area Capacity Enhancement Scheme Phase 2

    Please visit https://phase2.elyareacapacity.com/ for full details on this scheme consultation. More
    Opened 24 May 2021
36 results. Page 2 of 2