Connecting Reigate to Thameslink

Page 1 of 3

Closes 6 Apr 2020

Introduction

Network Rail will consider all feedback and confirm your personal data is not required unless you are content for Network Rail to be able to identify you as the source and the location of the feedback provided.

Any feedback provided will be collected and held solely by Network Rail inaccordance with the requirements of the General Data Protection Regulations. It will be used by Network Rail solely for purposes and duration in connection with the development of the design and securing any consent application, including publication of the final consultation report, as may be required.

1. Do you agree with our proposals to upgrade Reigate station?
(Required)
2. Do you agree with our proposed changes to services which would likely come about as a result of the upgrade?
(Required)
3. Do you have any comments on the proposals?