Ely Area Capacity Enhancement Scheme Phase 2

Page 1 of 3

Closes 4 Jul 2021

Introduction

The information will be collected and held solely by Network Rail in accordance with the requirements of the General Data Protection Regulations. The information you provide will be used to help the decision-making in this scheme.

We may share your information with our consultants. We will not publish your personal details but may publish your response with personal details removed. If you have consented to be added to our consultation mailing list, we may send you details of the consultation results and information about other consultations. You retain the right to opt out of the mailing list at all times. We will not sell your personal details or pass them to any other organisation except those directly involved in compiling and analysing the consultation responses.

1. What is your name?
2. What is your email address?
3. What is your postcode?
4. In general, I support the proposals to upgrade the railway in the Ely south area?
(Required)
5. Do you have any comments about the Soham branch line proposals we should consider?
6. Do you have any comments about the Ely Dock junction proposals we should consider?
7. Do you have any comments about the Ely station proposals we should consider?
8. Do you have any comments about the Stuntney Road Bridge we should consider?
9. At Cutter Bridge is your preference
(Required)
10. At Cutter Bridge do you prefer
(Required)
11. At Common Muckhill Bridge is your preference
(Required)
12. If Option 1 at Common Muckhill Bridge is chosen, would you prefer
(Required)
13. At Kiln Lane, for the footbridge, would you prefer?
(Required)
14. At Kiln Lane, for vehicle access is your preference
(Required)
15. If you wish to be contacted by Network Rail with further information or to discuss the feedback you have provided on the Ely Area Capacity Enhancements Programme

Something missing here? Return to a previously saved response.